ArtsEd Schools
Located in a tight landlocked block, the scheme reorganises a previously disparate campus into a cohesive whole, maximising every millimetre of space to unlock the potential of the existing buildings whilst delivering 2875m² of new facilities. The project is delivered in 3 phases to minimise disruption. The completed Phase 1 consists of a triple layer volume at the centre of the site housing; three 5m high dance studios, a suite of classrooms, large format rehearsal rooms, capped by a rooftop outdoor recreation space. A naturally lit atrium between new and old becomes the new heart and shared space for the schools. Inspired by ‘natural movement’ and the concept of transformational education through the medium of dance, the design reflects the pioneering vision of the women who founded ArtsEd in 1944. The new façade concept, reminiscent of musical and dance notation as well as physical movement, brings renewed coherence and identity to the campus reflecting the dynamic activity within.
Masterplanning the existing footprint unlocks the site to create much needed studio, rehearsal and teaching facilities. Lying within Carr’s 1877 Bedford Park, this arts building was adapted over the 20th Century leaving it disjointed and lacking in modern educational standards. The project fundamentally improves the existing spaces, whilst delivering new facilities to meet the spatial requirements previously only available off campus. Spatial planning designed to ensure safeguarding between schools has allowed all students to consolidate on one site. The school considered relocation and off site new-build, but settled on remaining to maintain and develop the close ties it has established with the community. ArtsEd has a strong outreach programme drawing a wide array of participants who share the school’s facilities and expert teaching. The masterplan sustainably enhances this educational asset, modernising its facilities to ensure future financial viability and resilience. A new circulation spine along the rear elevation of the original building allows the school to become fully accessible. A triple height top lit atrium becomes the central orientation core, embodying the dramatic and vibrant ethos of its students and staff. The façade uses economic industrial envelope technology in a bespoke and playful manner to elevate its materiality and provide a new identity to the school. Developing the existing façade rhythm and inspired by musical notation and dance movement, the arched fenestration affords playful and expansive views across London providing a unique identity to each of the dance studios. Future phases will deliver a new flexible Studio Theatre, a voice teaching suite, and further rooftop studios, continuing the ‘dancing’ façade around the front of the building. This development revitalises the existing site with exceptional facilities to support the world-renowned teaching at ArtsEd, fostering future generations of outstanding creative performers.
With economic and environmental sustainability in mind, careful consideration was given to proposals which minimised alterations of the existing building, maximizing its potential with only localised interventions. Key to the project, for both the new teaching spaces and the houses directly facing the school, was the delivery of a new high-performance façade able to minimise acoustic transmission and energy consumption. The design delivers efficiently by cloaking as much of the existing thin leaky façade as possible with new teaching spaces wrapped with a new envelope designed to exceed current regulation standards. The mix of ventilation demands of the spaces meant a hybrid natural ventilation strategy was applied. Turrets serve the new circulation spine between new/old spaces to maximise the benefit of newly installed plant. Rainwater runoff is controlled from the site with a blue roof, a sedum planted roof and below ground attenuation crates within the front hard landscaping area.















